CPM Aluminium & Glass
FEATURED PROJECT PORTFOLIO

Offices & Premium Residences

A collection of office towers, resort hotels and large architectural complexes for which CPM designed, fabricated and installed the façade.

150+
Projects delivered
500K+ m²
Aluminium & Glass Façades
100%
ASTM tested

Project list

Sky Park Residence – D25 Tower Cau Giay
VĂN PHÒNG & CHUNG CƯ CAO CẤP12,746 m²
Cau Giay, Hanoi

Sky Park Residence – D25 Tower Cau Giay

Supply and installation of exterior aluminium & glass doors and walls for the 37-storey D25 Tower in Cau Giay.

Hệ: Cửa, vách nhôm kính ngoài nhà Details →
Eco Dream
VĂN PHÒNG & CHUNG CƯ CAO CẤP12,969 m²
Thanh Tri, Hanoi

Eco Dream

Aluminium & glass doors, walls and glass balustrades for the 27-storey Eco Dream residential, office and retail complex.

Hệ: Cửa, vách nhôm kính & lan can kính Details →
Tan Thuan Tay Residential – HR1, M2, HR3 Towers
VĂN PHÒNG & CHUNG CƯ CAO CẤP72,083 m²
Quận 7, TP.HCM

Tan Thuan Tay Residential – HR1, M2, HR3 Towers

Supply and installation of aluminium & glass doors, walls, aluminium louvres and glass balustrades for the HR1, M2 and HR3 towers – Tan Thuan Tay Residential, District 7.

Hệ: Nhôm kính & louver nhôm Details →
DH2 Office – Hoang Long Industrial Park
VĂN PHÒNG & CHUNG CƯ CAO CẤP
Thanh Hóa

DH2 Office – Hoang Long Industrial Park

Supply and installation of aluminium & glass doors and walls, balustrades and a glass canopy for the DH2 office building – Hoang Long Industrial Park & Urban Area, Thanh Hoa.

Hệ: Nhôm kính & mái sảnh kính Details →
Showing 25 - 28 of 28 verified projects
CPM TECHNICAL LIBRARY

Company Profile, Standards & Technical Data

Download the full contractor profile, detailed reference project list and ASTM/ISO quality certificates.

PROJECT COLLABORATION & FAÇADE CONTRACTING

Preparing a new project?

Send architectural drawings, technical requirements or tender information so CPM's façade structural engineers can survey the site, take off quantities and propose a cost-optimised solution.

FAST RESPONSE Within 24 working hours
DRAWING CONFIDENTIALITY 100% NDA commitment
TECHNICAL SUPPORT 3D BIM modelling
SEND PROJECT DETAILS RESPONSE WITHIN 24H