An acoustic vibration-damping solution limiting urban noise from the elevated railway.
PROJECT NEWS
Lancaster Luminaire Tower: Semi-Unitized glass walls completed with 42dB sound insulation
architecture
EXECUTIVE SUMMARY
An acoustic vibration-damping solution limiting urban noise from the elevated railway.
CPM
CPM Façade Engineering & R&D Board
verified
Published: 28/01/2025
•
schedule 1 min read
RELATED FILES
View all R&D articles
arrow_forward
Recommended Façade Engineering Features
PROJECT NEWS
24/09/2026
•
21 min read
CPM Hanoi's mark on large-scale projects
Over more than 20 years, Ha Noi CPM Construction Corporation has worked on many large residential, commercial, resort, urban and infrastructure projects nationwide. From Noi Bai Terminal T2 and the National Innovation Center to Vinhomes mega-cities and resort complexes in Ha Long and Van Don, each project marks CPM's capability in aluminium & glass consulting, fabrication and installation.
PROJECT NEWS
26/02/2025
•
1 min read
Leadvisors Tower: 18,500 m² of Unitized façade accepted 25 days ahead of schedule
Outstanding completion of the Grade-A office envelope on Pham Van Dong, Hanoi.
PROJECT NEWS
20/02/2025
•
1 min read
Viettel Complex: Work begins on large-format glass & aerodynamic aluminium louvres
Installing 3m x 6m jumbo glass combined with automatically modulated sun louvres.
