CPM Aluminium & Glass
FEATURED PROJECT PORTFOLIO

CPM's mark on every project

A collection of office towers, resort hotels and large architectural complexes for which CPM designed, fabricated and installed the façade.

150+
Projects delivered
500K+ m²
Aluminium & Glass Façades
100%
ASTM tested

Project list

Công trình Khách sạn Mường Thanh Viêng Chăn — CPM thi công nhôm kính
HOTELS & RESORTS
Vientiane, Laos

Muong Thanh Vientiane Hotel

A project where CPM delivered the aluminium & glass works (before 2025).

Công trình Sunshine Crystal River – Noble Crystal Tây Hồ — CPM thi công nhôm kính
VĂN PHÒNG & CHUNG CƯ CAO CẤP50.850 m²
Tay Ho, Hanoi

Sunshine Crystal River – Noble Crystal Tay Ho

CPM supplied and installed glass walls, glass balustrades, louvres and glass roofs for towers S4 and S5 in 2026.

Hệ: Vách kính, lan can, louver Details →
Công trình Sunshine Sky City — CPM thi công nhôm kính
VĂN PHÒNG & CHUNG CƯ CAO CẤP
Quận 7, TP.HCM

Sunshine Sky City

An ongoing CPM project – aluminium & glass works in progress.

Công trình Taseco Long Biên — CPM thi công nhôm kính
VĂN PHÒNG & CHUNG CƯ CAO CẤP
Long Bien, Hanoi

Taseco Long Bien

An ongoing CPM project – aluminium & glass works in progress.

Công trình VIC Grand Square — CPM thi công nhôm kính
VĂN PHÒNG & CHUNG CƯ CAO CẤP
Việt Trì, Phú Thọ

VIC Grand Square

An ongoing CPM project – aluminium & glass works in progress.

Công trình Sunshine Green Iconic — CPM thi công nhôm kính
VĂN PHÒNG & CHUNG CƯ CAO CẤP
Long Bien, Hanoi

Sunshine Green Iconic

A project where CPM delivered the aluminium & glass works (before 2025).

Showing 19 - 24 of 65 verified projects
CPM TECHNICAL LIBRARY

Company Profile, Standards & Technical Data

Download the full contractor profile, detailed reference project list and ASTM/ISO quality certificates.

PROJECT COLLABORATION & FAÇADE CONTRACTING

Preparing a new project?

Send architectural drawings, technical requirements or tender information so CPM's façade structural engineers can survey the site, take off quantities and propose a cost-optimised solution.

FAST RESPONSE Within 24 working hours
DRAWING CONFIDENTIALITY 100% NDA commitment
TECHNICAL SUPPORT 3D BIM modelling
SEND PROJECT DETAILS RESPONSE WITHIN 24H