{"id":129,"date":"2026-09-25T11:01:51","date_gmt":"2026-09-25T04:01:51","guid":{"rendered":"http:\/\/cpm-theme.local\/du-an\/nha-ga-t2-noi-bai\/"},"modified":"2026-09-25T15:39:52","modified_gmt":"2026-09-25T08:39:52","slug":"nha-ga-t2-noi-bai","status":"publish","type":"du_an","link":"https:\/\/hanoicpm.com\/en\/du-an\/nha-ga-t2-noi-bai\/","title":{"rendered":"Terminal T2 \u2013 Noi Bai International Airport"},"content":{"rendered":"<p>International Passenger Terminal T2 is one of Vietnam's most important aviation infrastructure projects and a major international gateway to Hanoi.<\/p>\n<p>The T2 expansion increased the terminal's total floor area to over <strong>200.000 m\u00b2<\/strong>, raising capacity from about 10 million to <strong>15 million passengers per year<\/strong>, with the ability to serve up to 18 million passengers. Aircraft gates, passenger boarding bridges and many passenger facilities were also expanded and modernised.<\/p>\n<p>More than a transport building, Terminal T2 places high demands on architecture, operability, durability and finish quality.<\/p>\n<p>On this project, <strong>CPM supplied and installed door and glass wall systems during 2024\u20132025<\/strong>.<\/p>\n<p>Taking part in an aviation infrastructure project with specific requirements is a notable milestone in CPM's capability profile. It is not only about construction volume but also reflects the ability to meet processes, quality and coordination on a large operational facility.<\/p>\n<p>For CPM, Noi Bai Terminal T2 is one of the landmark projects reflecting its expansion from residential and commercial projects into high-standard infrastructure and public buildings.<\/p>","protected":false},"excerpt":{"rendered":"<p>CPM supplied and installed doors and glass walls for the Terminal T2 expansion during 2024\u20132025.<\/p>","protected":false},"featured_media":130,"menu_order":45,"template":"","loai_du_an":[5],"he_mat_dung":[],"class_list":["post-129","du_an","type-du_an","status-publish","has-post-thumbnail","hentry","loai_du_an-ha-tang-cong-cong"],"_links":{"self":[{"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/du_an\/129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/du_an"}],"about":[{"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/types\/du_an"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/media\/130"}],"wp:attachment":[{"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/media?parent=129"}],"wp:term":[{"taxonomy":"loai_du_an","embeddable":true,"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/loai_du_an?post=129"},{"taxonomy":"he_mat_dung","embeddable":true,"href":"https:\/\/hanoicpm.com\/en\/wp-json\/wp\/v2\/he_mat_dung?post=129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}